In short: on 5 November 2026, The Standard reported that three of the nine dialysis machines in the upper renal unit at Nakuru Level Five Hospital were working, and that sessions had been cut from four hours to three. The report did not say why the machines had stopped. On a Fresenius 4008, the manufacturer's technical manual links many hydraulic faults to a short list of wear parts, so a unit that plans its safety checks, keeps those parts on the shelf and logs every part it fits is less likely to lose a machine while it waits for an order.

This post is for biomedical engineers and county renal unit managers. It sets out what was reported in 2026, then a practical checklist drawn from the 4008 technical manual and our Fresenius 4008 preventive maintenance guide.

What did the 2026 reports say about public renal units?

  • Machines under the MES programme. On 23 July 2026, The Star reported an audit of the Managed Equipment Services (MES) programme, which from 2015 placed dialysis machines in 54 public hospitals. Using data from June 2015 to April 2021, the audit found that 63% of the hospitals ran below half of their machines' capacity. The Star also reported that the national government has agreed to replace MES with National Equipment Support to Counties (NESC).
  • Machines out of service. The Standard's 5 November 2026 report on Nakuru described three of nine machines working and shorter sessions.

None of these reports says that spare parts caused a breakdown. This post covers the part a unit can control: keeping its own machines running.

Which Fresenius 4008 parts are behind common hydraulic faults?

The 4008 technical manual's error descriptions and safety checks point to six areas.

  • Balancing chamber solenoid valves (31 to 38). A valve that does not seal shows up as a pressure holding test failure. The manual links the negative pressure holding test failure (F06) to a leak in the hydraulic system, and names valves such as V24, V24B, V26, V36 and V38 as causes of positive pressure holding test failures.
  • The flow pump and its drive. The manual explains that the balancing chamber valves switch on the current rise pulses of the flow pump's drive motor, so a worn flow pump can cause balancing chamber switching errors as well as low flow.
  • The degassing pump drive. The manual's rated degassing pressure at port D is minus 0.81 to minus 0.85 bar. Pressure that will not hold, or a "V39 failure" message, can point to the drive.
  • Filters and seals. The manual lists a clogged filter upstream of the degassing pump (filter 210, or the cartridge filter) as a cause of the same degassing errors. Check the low-cost part before you replace the drive.
  • Line roller pump rotors. The safety check inspects the rotors for damage, and the manual states that damaged rotors must be replaced by new ones.
  • The battery. The self-test checks battery voltage under load. The manual's error F02 means the charge is insufficient for 15 minutes of emergency operation.

What should a 4008 unit keep on the shelf?

Work from your machine's own spare parts list, because the 4008 B, H and S variants and their options use different parts. As a starting checklist, with Fresenius part numbers to confirm against that list:

For every machine due a safety check in the next quarter

  • TSC and maintenance kit for the 4008 (M339331); check its contents against the maintenance checklist for your configuration
  • Filter for the concentrate and bicarbonate suction tubes (6526131)
  • Fan filter mat for the monitor (6715771)
  • O-ring supplement set (M375271)

For the fleet, sized to the number of machines

  • High Kv solenoid valves, one-port (M339901) and two-port (M339911), plus the standard valve types your spare parts list names for each position
  • Complete gear pump (6751421)
  • Flow drive (6707661) and degassing drive (6707671)
  • Filter cartridge (6438791)

Checked at every safety check, ordered when worn

  • Line roller pump rotors, matched to your pump positions
  • Rechargeable battery 18 V (6720291)

You can browse these parts in our Fresenius 4008 collection. Part numbers change over time, so confirm the current number with your supplier before ordering.

How do you plan preventive maintenance so a machine never waits for parts?

The 4008 manual sets a technical safety check and maintenance every 24 months when the machine meets all of its rotor, software, DIP switch and titanium heater rod conditions. Otherwise the interval is every 12 months. Every check must be recorded in the medical device register.

A plan that keeps machines in service has three habits:

  1. One due date per machine, with the reason. If you cannot confirm the software version or heater rod material, plan for 12 months.
  2. Order before the due date. A safety check that waits for parts is the check that gets skipped.
  3. Stagger the dates. Spread due dates across the year so that the unit does not have several machines out for maintenance at once, and so that one order can cover the machines due together.

Our preventive maintenance guide lists what each check replaces and the values to record.

How do you keep a spares log?

Keep one line per part fitted, with:

  • the machine's serial number, variant (4008 B, H or S) and software version;
  • the hour meter reading on the day;
  • the error code or symptom that led to the repair;
  • the part name and number fitted, and any older number it replaced;
  • the date, and the name of the engineer;
  • the stock left on the shelf afterwards.

Use the machine's hour meter, as well as the paper session register. The audit The Star reported on 23 July 2026 found that in almost eight in ten of the audited hospitals, machine hour counters recorded more work than the paper registers. After a year, the log shows which parts your fleet uses and how often: the basis for your shelf list.

How should lead times shape the plan?

A part not held in Kenya has to be ordered, shipped, cleared through customs and delivered, and your own procurement steps add to that. Plan with the full chain:

  • Ask each supplier for a lead time in writing, per part number.
  • Set a reorder point for each part: the number you expect to use during the full lead time, plus a margin for a second failure.
  • Reorder when stock reaches that point, not when the shelf is empty.

The Star did not report how maintenance and spares will be handled under NESC. Until each county knows who holds spares and who services the machines, a unit's own log and shelf list are the records it can rely on. If you need help matching part numbers, contact us.

Frequently asked questions

What spare parts should a dialysis unit keep for a Fresenius 4008?

A TSC and maintenance kit per machine due a check in the next quarter, filters and O-rings, and, across the fleet, solenoid valves, a gear pump, flow and degassing drives and filter cartridges. Confirm every part number against the machine's spare parts list.

How often does a Fresenius 4008 need a technical safety check?

Every 24 months if it meets all of the technical manual's conditions on rotors, software version, DIP switch settings and a titanium heater rod. Otherwise every 12 months.

What should a dialysis machine spares log record?

The machine's serial number, variant and software version, the hour meter reading, the error code or symptom, the part number fitted, the date, the engineer and the stock left on the shelf.

How do you set a reorder point for dialysis spare parts?

Estimate how many of the part you use during the full lead time, from order to fitting, including your own procurement steps, and add a margin for a second failure. Reorder when stock reaches that number.

This article is produced by Nanto Med for educational purposes. We are equipment suppliers, not clinicians, and this is not a substitute for the manufacturer's service documentation or authorised service. The manual states that assembly, adjustments and repairs must be carried out by the manufacturer or persons it authorises. Fresenius and 4008 are trademarks of Fresenius Medical Care. Nanto Med is an independent supplier and is not affiliated with Fresenius Medical Care.

References

  1. The Star, "Audit shows Sh3.7bn gamble on dialysis machines has paid off", 23 July 2026.
  2. The Standard, "Renal patients raise alarm over faulty dialysis machines", 5 November 2026.
  3. Fresenius Medical Care, 4008 E / 4008 B / 4008 H / 4008 S Hemodialysis System Technical Manual, edition 5/03.09, chapter 1 (theory of operation and error descriptions) and chapter 2 (technical safety checks and maintenance).